Who This Checklist Is For
-
Step 1: Define Your Real Demand (Not Just CFM)
-
Step 2: Choose Between Oil‑Free and Oil‑Injected
-
Step 3: Verify Installation Requirements
-
Step 4: Don't Forget the Dryer and Filters
-
Step 5: Understand the Total Cost of Ownership (TCO)
-
Step 6: Create a Preventive Maintenance Schedule
-
Step 7: Plan for Spare Parts and Manuals
-
Step 8: Train Your Operators
-
Common Mistakes to Avoid
-
Final Thought: The Industry Has Changed
Who This Checklist Is For
If you're an administrative buyer tasked with sourcing or maintaining compressed air equipment — maybe for a manufacturing line, a service workshop, or a small industrial facility — this checklist is for you. I manage roughly $200K annually across 6 vendors for our company's operational needs, and I've learned the hard way that a compressor purchase isn't just about horsepower and price.
When I first started handling equipment orders, I assumed the cheapest unit with the highest CFM rating was the obvious choice. Three years and two costly service calls later, I realized I was missing half the picture.
Here are 8 steps that cover the full lifecycle — from selecting the right Atlas Copco model to keeping it running without surprises.
Step 1: Define Your Real Demand (Not Just CFM)
Most buyers ask "How much air do I need?" But that's like asking "How much horsepower do I need?" — it ignores duty cycle, pressure requirements, and future expansion.
Do this:
- Audit all pneumatic tools and equipment that will run simultaneously. Include a 20% safety margin.
- Check peak pressure requirements — some tools need 100 psi while others run fine at 80.
- Consider growth: If you plan to add a second production shift next year, oversize the compressor now (it's cheaper than buying a second unit later).
For an Atlas Copco GA18 (a popular 18 kW oil‑injected screw compressor), the free air delivery is around 2.8 m³/min at 7.5 bar. That spec looks fine on paper — but if your tools require 90 psi and your piping has friction losses, you'll need to account for that. The GA18 manual (available on Atlas Copco's website) includes a detailed performance table. Download it early.
Step 2: Choose Between Oil‑Free and Oil‑Injected
This is where many first‑time buyers trip up. I certainly did.
Oil‑injected compressors (like the GA series) are cheaper, more efficient, and fine for most industrial uses. But if your application involves food processing, pharmaceuticals, or painting, oil carryover can ruin product batches. That's when you need oil‑free technology — Atlas Copco's Z series or the newer gerador Atlas Copco (their generator/compressor hybrids) sometimes offer oil‑free options too.
Key point: Oil‑free is 2–3x more expensive upfront. Only choose it if your process requires ISO 8573‑1 Class 0 air quality. Otherwise, a properly maintained oil‑injected unit with a good filter system is perfectly safe.
Step 3: Verify Installation Requirements
This step is often overlooked until the compressor arrives and someone asks "Where does the power go?"
- Power supply: Atlas Copco GA18 typically needs 3‑phase power (380‑415V). Check your facility's voltage and phase before ordering.
- Ventilation: Compressors produce heat. The GA18 manual specifies minimum clearance and airflow — ignoring this leads to overheating and reduced efficiency.
- Foundation: Smaller units can sit on a concrete floor, but heavier ones (like the GA 30+) might need vibration pads or anchoring.
- Piping: Use properly sized pipes — undersized pipes cause pressure drop. Copper or aluminum is standard; avoid PVC (it can shatter under pressure).
Step 4: Don't Forget the Dryer and Filters
Your compressor only delivers compressed air. It doesn't remove water, oil vapor, or particulates. That's the job of downstream equipment.
I once skipped the dryer to save $1,200. Within a month, moisture damaged our pneumatic controls, costing $4,000 in repairs. My VP was not happy.
Standard recommendation:
- For typical shops: a refrigerated dryer (dew point ~3°C) plus a particulate filter and coalescing filter.
- For critical applications: add a desiccant dryer (dew point -40°C) and an activated carbon filter.
Atlas Copco offers integrated solutions (the FD series dryers) that match their compressors — usually a good call because they're designed to work together.
Step 5: Understand the Total Cost of Ownership (TCO)
The purchase price is just the entry point. Over a 10‑year lifespan, energy costs account for about 70–80% of total ownership. A more efficient compressor can save thousands in electricity.
For example, an Atlas Copco GA18 VSD (variable speed drive) model adjusts output to match demand. Compared to a fixed‑speed unit, it can reduce energy consumption by 35% under partial load. The initial premium pays back in 1–2 years.
Also factor in maintenance: Oil changes every 2,000 hours, separator elements every 4,000 hours, and air filters. Atlas Copco's service kits are reasonably priced, but third‑party options exist (just ensure they meet specs).
Step 6: Create a Preventive Maintenance Schedule
Your compressor will come with a manual — the atlas copco ga18 manual is about 120 pages. The maintenance schedule is inside (usually page 50‑60). Copy it and set calendar reminders.
Minimum checks:
- Daily: Check oil level, drain condensate from the separator, listen for unusual noises.
- Weekly: Inspect air filter indicator, check belt tension (if applicable).
- Monthly: Test safety valves, check electrical connections, clean cooling fins.
- Annually: Replace oil, air filter, oil filter, separator element. Have a certified technician inspect the entire system.
Don't trust memory — I've seen three shutdowns in two years because someone forgot the annual service. Use a CMMS or even a shared spreadsheet.
Step 7: Plan for Spare Parts and Manuals
When something breaks, you don't want to wait two weeks for a replacement part.
- Stock critical spares: air filter, oil filter, separator element, gasket kit, and a set of belts (if not direct drive).
- Keep a digital copy of the atlas copco ga18 manual and the electrical schematic on your phone and in the cloud.
- Register your unit on Atlas Copco's website to get firmware updates and recall notices.
Gerador Atlas Copco models (compressors that also generate power) have additional electronic controls; keep those manuals accessible too.
Step 8: Train Your Operators
The best equipment fails if nobody knows how to use it properly.
Schedule a 2‑hour training session with the Atlas Copco local service team (often included with purchase). Cover: start/stop procedures, emergency shutdown, how to read the controller display (Elektronikon®), and how to change filters safely.
I once had an operator reset a safety alarm 15 times instead of investigating the cause. That cost us a week of downtime. Proper training prevents that.
Common Mistakes to Avoid
Here are three I made myself — learn from them:
- Buying too big. A larger compressor running at part load is less efficient than a correctly sized one. Measure your actual usage with a data logger before ordering.
- Ignoring power quality. Voltage drops or phase imbalances can damage the motor. Have an electrician check your supply before installation.
- Treating the manual as optional. The GA18 manual includes torque specs for electrical connections and tightening sequences for the airend. Skipping those caused a leak I had to fix myself at 2 AM.
Final Thought: The Industry Has Changed
Five years ago, buying a compressor was mostly about physical specs. Today, connectivity matters — Atlas Copco's SMARTLINK remote monitoring can alert you before a failure happens. The industry is evolving toward predictive maintenance and energy optimization. If you're still relying on a paper logbook, you're missing out.
That said, the fundamentals haven't changed: clean air, proper sizing, and regular service are still what make a compressor last 15 years instead of 7. Use this checklist, keep the manual close, and you'll be ahead of 90% of buyers out there.